ests logo

24 HOUR SUPPORT
0808 168 6028 (freephone)
enquiries@estsonline.co.uk

Linford - Buckinghamshire

Installation of Klargester BB BioDisc 

When the Environment Agency realised that a septic tank at this property in Linford Buckinghamshire was discharging directly into a river, they immediately insisted on action to address the situation. The company that emptied the tank advised the property owner to contact ESTS.

Upon inspection, ESTS recommended that a proper treatment plant was required along with new drainage both from the property to the tank and from the tank to the watercourse.

As a result, ESTS was commissioned to install a new Klargester BB BioDisc with a proper sample chamber and an outlet discharging into the river, and also to lay over 150 metres of new inlet drain.

The work was completed swiftly and successfully, ESTS paying particular attention to the careful reinstatement of the lawn at this extremely attractive property.

Old septic tank
Work begins
Pipes ready to lay
 Old septic tank Work begins  Pipes ready to lay 
Drainage pipes being laid
Drainage running from main manhole
Klargester BioDisc concreted in
 Drainage pipes being laid Drainage running from main manhole  Klargester BioDisc concreted in 
Outlet to sample chamber
Treatment plant installed
Surrounds ready for seeding
 Outlet to sample chamber Treatment plant installed  Surrounds ready for seeding 
Footpath reinstated
Footpath reinstated ready for seeding
Careful reinstatement of lawn
 Footpath reinstated Footpath reinstated ready for seeding  Careful reinstatement of lawn 
klargester logo wpl logo tuke logo conder logo fabrication logo balmoral logo titan logo
 Site map |  Privacy policy © ESTS Ltd.